DETAILED CONTROL VIA DIGITAL ELEMENT MARKERS

Design stage
Proprietary technical and architectural supervision is available online.

BimAR is integrated into standard architectural design software programs. When a 3D model of the project is created the BimAR plugin is used to make the details automatically assigned with unique identifiers and locations. Also, the plugin is used to deliver the SSD draughts with precise location of the detail marker to production for the further application of the interactive assembly diagram in the installation process.
Controllability of flexible changes and acceptability verification (in case the accomplished works deviate from the design data).
Proprietary technical and architectural supervision is available online.

BimAR is integrated into standard architectural design software programs. When a 3D model of the project is created the BimAR plug-in is used to make the details automatically assigned with unique identifiers and locations. Also, the plug-in is used to deliver the SSD draughts with precise location of the detail marker to production for the further application of the interactive assembly diagram in the installation process.
Production stage
The markers with unique identifiers are assigned and attached to details at the producing plant. The identifier code assignment and item record are launched automatically by the mobile facility. Activation instantly displays in the system.

BimAR would allow receiving the information on the produced details and to displaying this information in the system. The data connection can be also translated via AR devices.
Storage stage
The store condition monitoring allows assigning the marked details in a fixed sequence according to the assembly diagram and working execution project. The item data is uploaded to Cloud Service which makes it possible to see the data online and to compare the actual quantity and location of details to the required one.

Shipment stage
The marked details are loaded in groups according to the assembly diagram and working execution project. The coordination of quantity of the loaded material with the bill of dispatch is automatically proceeded in the program.
BimAR would help to avoid mistakes while loading the material from the producing plant and would reduce the costs of extra use of machinery. Also, it would significantly improve the verification process.
Installation stage
Precise identification and instant search of the details at the building site. AR glasses and mobile facilities used by engineers at the construction site allow:
• to unload the elements, taking the required sequence during their installation into account;
• to see the design position of the elements including the integration into the mounted constructions;
•to see the missing installation elements and their location.

Error exception and extra cost reduction during the installation.
The axle marks and the results of the pre-construction survey are displayed in BimAR*.

Remote monitoring
The BIMAR system proceeds interactive correlation of the process and the result of installation to the design position of the details.
It is also capable of entering the results of the tacheometer pre-construction survey and controlling the correspondence of construction tolerances and design arrangements.
All the contributors of the project execution may view the 3D object model, the state of the construction process , and its correspondence to design documentation in real-time.
BimAR allows controlling the construction process and provides proprietary remote monitoring.
BIMAR SYSTEM

DETAILED CONTROL VIA DIGITAL ELEMENT MARKERS
SCANNING
Markers are scanned from a distance, identifying and displaying the item's location information on the screen. The previously scanned marker and its location are saved in the system and displayed on the map, thus showing the location of items that are not in line of sight.
Interactive visualization of the location of elements. The presence of a unique identifier forms the "history file" of the item.
DIGITAL TWIN ELEMENT LOCATIONS
The fixed location and three-dimensional representation of elements is available to users of the BimAR system.

Accurate location data is automatically determined and positioned in space.The marker does not depend on temperature conditions, does not contain a battery.
ASSEMBLY DIAGRAM
Digital marking and identification of adjacent elements allows for interactive wiring diagram. The correct sequence of storage, transportation and installation of structures is ensured.

Such problems are solved as: manual search for heavy overall structures, errors in the recognition of parts and marking, errors in loading and installation.
Detail attachment sequence is monitored during the installation.
TRANSPORTATION
Location Visualization
Setting tasks in the application interface
Location based element history
Helps avoid loading/unloading errors
Reduces paperwork and human error

VIDEO BROADCASTS

News, stories, and views

Presentation of BIMAR SYSTEM for the space industry
2021, 22 December


Demonstration of the concept of BimAR algorithms for the installation of units and elements of spacecraft.
BIMAR SYSTEM

About BIMAR

Detailed control via digital element markers.
Mobile application BIMAR

Demonstration of the BimAR System mobile application

The application makes it possible to control the accuracy of the installation of elements, as well as to carry out the mutual transfer of data from the construction site to the project and vice versa.

The state of the mounted elements is displayed in the BimAR system interface on mobile devices and in design programs in real time.